Logistics Warehouse, 12,000 m²

Distribution center for a Thai consumer-goods group near Bangkok Port, erected in 62 days including two internal mezzanine office blocks.

Location
Thailand
Completed
2024
Area
12,000 m²
Clear span
32 m
Steel tonnage
780 t

The client needed a cross-dock distribution center within 90 days of groundbreaking. We engineered 32 m clear-span rigid frames with 8 m eave height, 12 dock levelers and a 1,200 m² mezzanine office block, then shipped 780 t of fabricated steel in nine 40'HC containers.

Our six-person erection supervision team worked alongside local crews, completing the frame in 38 days and full handover — cladding, doors, floors and offices — on day 62.

Logistics Warehouse, 12,000 m² site photo 1Logistics Warehouse, 12,000 m² site photo 2

Get a quotation for your project

One message is enough. Our engineering team takes it from there.

Your information is used only to answer this inquiry. No spam, ever.